Record wall services
Photograph conduit routes, electrical boxes, water lines, drainage, AC pipes and data cables. Include fixed room references so the route can be located later.
01 Record
Wall · Floor · Ceiling · Waterproofing
Conduits, pipes, drains, waterproofing, ducts and concealed services become much harder to identify once plaster, flooring or false ceilings cover them.
The useful record is not just a close-up of a pipe. It should show enough of the room, wall or floor that someone can understand where that concealed route sits later.
Photograph concealed work before each covering layer hides it.
02 Stages
The documentation should follow construction. Photograph the systems while they are visible, before the next layer makes their exact position difficult to recover.
Photograph conduit routes, electrical boxes, water lines, drainage, AC pipes and data cables. Include fixed room references so the route can be located later.
Where relevant, capture plumbing routes, floor services, waterproofing, drain positions, underground lines and tank work before screed or flooring hides them.
Photograph electrical routes, AC ducts, drain lines, automation modules, speakers, access zones and junction locations before the ceiling disappears.
Photograph bathrooms, balconies, terraces, tanks and below-ground waterproofing before tiling or backfilling. Retain product details, contractor information, warranties and testing records where available.
03 Archive
If a plumbing line, socket or service route changes on site, the original drawing can become misleading. Important changes should be reflected in marked-up drawings, revised drawings, written records or photographs.
Changes that affect price, design or performance should also record what changed, why it changed, any additional or reduced cost, and who approved it.
Save enough product information to identify replacements later: paint shade, tile code, laminate code, sanitaryware model, tap range, switch range, window system and hardware where relevant. You do not need a museum of packaging.
A strong concealed-work map can combine the final drawing, photographs and notes for a specific area—for example, the socket location, conduit route, data point and AC drain route behind a bedroom TV wall.
Could you find and understand this record five years later without remembering the construction personally?
04 Check
Five years later, a contextual photograph of concealed services can be far more useful than a photograph of the finished room—especially before drilling, repairing or modifying a wall.
The strongest record connects the photograph to a location, fixed room reference, route description and date, then stores it with the final project information.
The drawing is only useful if it still matches reality.
Apply the idea
Arrange the documentation sequence in the correct order.
© 2026 Ace Arc Pvt. Ltd. All Rights Reserved.
Sign in to continue your session, or start a project with ACE to use our tools as part of your project journey.
Just the essentials. Verify your email and return to your project.
We’re still building this. Share your details to be the first to know.
Adding {{itemName}} to cart
Added {{itemName}} to cart